Jim H has been away for a few weeks R & R but is now back to continue with the footbridge renovation at Wishaw. Here is Jim's report:-
Ray and I spent some time attempting to nut split some of
the old and well rusted bolts securing the treads on the spare staircase.
Not easy when these are about a foot above your head. In the end we
gave up on this activity and Roger powered up the new generator and disc cutter
with more success.
Later in the day we all worked on the main span in the outer
windswept yard. The last few high level brackets were removed, ropes were
run along the roof supports and then tarpaulins installed and tied down.
Finally the plywood and non slip surface covering the walkway timbers
were removed. Hopefully on our next visit these can be removed and we
will then be able to see the full extent of the rust on the main support beams.
Jim H.
Bill
Having been away from Wishaw for several weeks it was good
to get back there today and meet up with Roger J, Ray, Peter Q and Ian.
The weather remained fine but it was surprisingly breezy when working in
the outer yard on the main span. There had also been a proliferation of 08
shunters taking place in recent weeks!!
Fortunately the tarpaulins covering the staircase sections
were still in place and were doing a good job protecting the woodwork beneath.
Roger managed to bail at least 100 gallons of rainwater off the top of
the sheets in anticipation of needing to do the same again next week, if the
anticipated showers arrive at the end of the week.
Peter Q concentrated initially on recovering the handrail
brackets form the staircase sections. The rusted in screws were a real
challenge but he persevered and won through in the end.
Installing the last tarpaulin on the main span |
Lifting the protective plywood flooring |
Close of play with only the main floorboards left to remove |
Regards